{"id":2539,"date":"2014-08-28T20:11:07","date_gmt":"2014-08-28T18:11:07","guid":{"rendered":"http:\/\/www.tinosecolodge.gr\/el\/%ce%bc%ce%b7-%ce%ba%ce%b1%cf%84%ce%b7%ce%b3%ce%bf%cf%81%ce%b9%ce%bf%cf%80%ce%bf%ce%b9%ce%b7%ce%bc%ce%ad%ce%bd%ce%bf\/the-construction-site-is-on\/"},"modified":"2024-07-02T15:10:20","modified_gmt":"2024-07-02T13:10:20","slug":"the-construction-site-is-on","status":"publish","type":"post","link":"https:\/\/www.tinosecolodge.gr\/el\/news-el\/the-construction-site-is-on\/","title":{"rendered":"The construction site is on"},"content":{"rendered":"<p>Yes, finally we got most of the paperwork done and started on the 27.7.14 the construction on site!!<br \/>\nWe decided to move into tents on the plot in order to get a better impression of the work and of course to make the 6:30 morning shift easier.<br \/>\nSo after the first weeks here are some impressions on what we are doing and how it looks like.<br \/>\nThe first thing to start with was the excavation for the foundations of the two houses, utility house and cistern &#8230;..a lot of rock, a lot of dirt and a big mess.<br \/>\nWhile the big machines did their job we started fixing some of the broken dry stone walls, although a back breaking job, it gives direct satisfaction caused by immediate result.<br \/>\nAfter the first excavation the molds for the foundation slabs were constructed and the iron was installed.<br \/>\nThrough the planning process we had decided to get all installations like fresh water, grey water, black water and electricity into the concrete foundation, so we installed like a million pipes&#8230;&#8230;.<br \/>\nSo at the moment the whole for the huge cistern of 100 cubic meters is molded and we had the first official control, everything came out smooth till now.<br \/>\nSo greetings to all of you reading this!<\/p>\n<p>Ps: Time-lapse videos of the work are in preparation!<\/p>\n<figure id=\"attachment_474\" class=\"alignleft fixed\" style=\"width: 1201px;\">\n<div class=\"\"><img loading=\"lazy\" decoding=\"async\" class=\" size-full wp-image-474\" src=\"http:\/\/www.tinosecolodge.gr\/cms\/wp-content\/uploads\/2015\/05\/blog-tinos-ecolodge-work-progress.jpg\" alt=\"blog-tinos-ecolodge-work-progress\" width=\"1201\" height=\"887\" srcset=\"https:\/\/www.tinosecolodge.gr\/cms\/wp-content\/uploads\/2015\/05\/blog-tinos-ecolodge-work-progress.jpg 1201w, https:\/\/www.tinosecolodge.gr\/cms\/wp-content\/uploads\/2015\/05\/blog-tinos-ecolodge-work-progress-500x369.jpg 500w, https:\/\/www.tinosecolodge.gr\/cms\/wp-content\/uploads\/2015\/05\/blog-tinos-ecolodge-work-progress-768x567.jpg 768w, https:\/\/www.tinosecolodge.gr\/cms\/wp-content\/uploads\/2015\/05\/blog-tinos-ecolodge-work-progress-81x60.jpg 81w, https:\/\/www.tinosecolodge.gr\/cms\/wp-content\/uploads\/2015\/05\/blog-tinos-ecolodge-work-progress-56x41.jpg 56w, https:\/\/www.tinosecolodge.gr\/cms\/wp-content\/uploads\/2015\/05\/blog-tinos-ecolodge-work-progress-1090x805.jpg 1090w, https:\/\/www.tinosecolodge.gr\/cms\/wp-content\/uploads\/2015\/05\/blog-tinos-ecolodge-work-progress-535x395.jpg 535w, https:\/\/www.tinosecolodge.gr\/cms\/wp-content\/uploads\/2015\/05\/blog-tinos-ecolodge-work-progress-350x258.jpg 350w, https:\/\/www.tinosecolodge.gr\/cms\/wp-content\/uploads\/2015\/05\/blog-tinos-ecolodge-work-progress-258x191.jpg 258w, https:\/\/www.tinosecolodge.gr\/cms\/wp-content\/uploads\/2015\/05\/blog-tinos-ecolodge-work-progress-1150x849.jpg 1150w, https:\/\/www.tinosecolodge.gr\/cms\/wp-content\/uploads\/2015\/05\/blog-tinos-ecolodge-work-progress-112x83.jpg 112w\" sizes=\"auto, (max-width: 1201px) 100vw, 1201px\" \/><\/div>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Yes, finally we got most of the paperwork done and started on the 27.7.14 the construction on site!! We decided to move into tents on the plot in order to get a better impression of the work and of course to make the 6:30 morning shift easier. So after the first weeks here are some [&hellip;] <a href=\"https:\/\/www.tinosecolodge.gr\/el\/news-el\/the-construction-site-is-on\/\" class=\"more-link\">read more<span class=\"icon-right-open-big\"><\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[15],"tags":[],"class_list":["post-2539","post","type-post","status-publish","format-standard","hentry","category-news-el"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.tinosecolodge.gr\/el\/wp-json\/wp\/v2\/posts\/2539","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.tinosecolodge.gr\/el\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.tinosecolodge.gr\/el\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.tinosecolodge.gr\/el\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.tinosecolodge.gr\/el\/wp-json\/wp\/v2\/comments?post=2539"}],"version-history":[{"count":2,"href":"https:\/\/www.tinosecolodge.gr\/el\/wp-json\/wp\/v2\/posts\/2539\/revisions"}],"predecessor-version":[{"id":10926,"href":"https:\/\/www.tinosecolodge.gr\/el\/wp-json\/wp\/v2\/posts\/2539\/revisions\/10926"}],"wp:attachment":[{"href":"https:\/\/www.tinosecolodge.gr\/el\/wp-json\/wp\/v2\/media?parent=2539"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.tinosecolodge.gr\/el\/wp-json\/wp\/v2\/categories?post=2539"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.tinosecolodge.gr\/el\/wp-json\/wp\/v2\/tags?post=2539"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}